1.Raw Material Prepare(Cutting Tube)

 

page-581-503

Check each outer dia of the tube difference <=0.2mm

Tube length difference is +/-0.5mm

 

2.Deburring

 

page-629-437

 

3.Washing the tubes

using the brush to clean the tubes,Using compressed air to blow out the residue.

Using compressed air to blow out the residue.

 

4.wiring

 

5.Magnesium powder filling

 

page-566-475

 

Putting the magnesium powder in the plate ,the powder thickness not exceed 40mm,

take it into oven,baking 1-3 hours in the temperature 100 degree till absolutely dry.

Filling ratio must reach 2.4-2.6g/cm2

 

promise the terminal not shacking,promise the powder not leak.

Checking the terminal if is bent,if bent,should adjust it straight

 

6.Tube shrinking

page-860-521

 

Clean all the tube before shrinking

Pay attention to the tube direction before shrinking

Tube diameter tolerance should be in +/-0.8mm

 

7.Heat treatment:Annealing

As the material is stainless steel 304,so we should use Partial annealing

Temperature controled at 700℃

 

Putting the heating elements in the oven Layered homogeneously

Avoid the heat reatment inadequate

 

8.Tube bending

bend the tube according to the drawing,appearance should not have scars.

 

 

page-528-432

9.Welding

page-329-324

 

afford the water pressure test(1.0Mpa) and no leakage

 

10.Sealing

 

 

page-543-615

 

Before sealing,make the high voltage test

No breakdown flashover,Insulation infinite

 

11.Final Inspection

 

Insulation:infinity,endure 10S

High voltage test

page-482-515

 

Resistance test

 

page-616-343

 

 

 

 

 

Customer First

We transform your requirements into customer-centric, technologically advanced and economical solutions.